SDRC 9.8c Part 1 Smart Analytic and Forecasting Evaluation

Posted on December 6th, 2016

This Successful Delivery Reward Criteria (SDRC) document meets the criterion defined in the New Thames Valley Vision (NTVV) full bid submission. The New Thames Valley Vision (NTVV) full bid submission [SSEPD 2011] defines the Successful Delivery Reward Criteria (SDRC) that must be met in line with the project milestones. This report addresses the criteria for […]

SDRC 9.6 Evidence Report: Low Voltage Network Modelling Environment Built, Installed and Commissioned

Posted on September 9th, 2016

Criterion: Build, Install and Commission the Low Voltage Modelling Environment component of the Distributed Solutions Integrator System (DSI). Evidence: Photographic evidence of the LV modelling environment and an invitation to see it in operation and an online demonstration. Prepare documentation and present work including: a) Commissioning reports b) Sample of data capture/ transfer c) Report on lessons learnt during process […]

SDRC 9.8(a) Part 8 Knowledge Sharing Report: Overall Proven Benefits

Posted on September 9th, 2016

Criterion: Prepare final reports on the trials carried out on the subjects listed in “Evidence 9.8” as well as an end of project report Evidence: • Use of modelling to support DNO investment decisions • Use of modelling to support others (customers, industry, local government) This document provides details of the Network Modelling Environment and the […]

SDRC 9.8(a) Part 7 Knowledge Sharing Report: Integration Solution Control Evaluation

Posted on September 9th, 2016

Criterion: Prepare final reports on the trials carried out on the subjects listed in “Evidence 9.8” as well as an end of project report. Evidence: Data availability (preparation of data, works required, indirect costs) Functionality (assess against business and functional requirements) Integration (communications, interfaces with other systems) Scalability (consequences of applying to a larger network) This […]

SDRC 9.8(a) Part 5: EV Chargers Usage Evaluation and Issues

Posted on September 9th, 2016

Criterion: EV Chargers usage evaluation and issues Evidence: This document details the completion of the EV Chargers usage evaluation and issues, discussing the network effects and presents the findings identified from the EV model through the Network Modelling Environment (NME) in line with the evidence criteria specified for the Successful Delivery Reward Criteria (SDRC). Graphical results produced from the […]

SDRC 9.5(c) Evidence Report: Aggregate and integrate forecasts to produce first report on the modelling of LV load profiles.

Posted on September 9th, 2016

Criterion: “Aggregate and integrate the short, medium and long term forecasts and produce first report on the modelling LV load profiles.” Evidence: Include Examples to illustrate effectiveness of the methods. Early validation will also be presented using data collected prior to this date. We will compare against real data to validate the robustness of the […]

SDRC 9.5(b) Evidence Report: Testing Methods to Produce Accurate Half Hour Forecasts of Domestic Energy

Posted on September 9th, 2016

Criterion: “Produce first report on the testing of the various mathematically rigorous methods used, develop and produce accurate half hour resolution short, medium and long term rolling forecasts of domestic energy loads.” Evidence: “Results will be presented together with analysis, evaluation and tests of the methods including accuracy and error estimates and comparisons of techniques” […]