SDRC 9.8(a) Part 6 Knowledge Sharing Report: Smart Meter performance

Posted on September 9th, 2016

This report makes observations on Smart Meter performance based on: interactions with Energy Suppliers, direct engagement with distribution network customers, the project roll-out of smart-meter like equipment, management of data through a head-end system and storage and manipulation of data using a data historian. The NTVV project reflects a future scenario where access to smart […]

SDRC 9.8(a) Part 1 Knowledge Sharing Report: End Use and Network Monitoring Evaluation

Posted on September 9th, 2016

Criterion: Prepare final reports on the trials carried out on the subjects listed in “Evidence 9.8” as well as an end of project report Evidence: (1) End Use and Network Monitoring Evaluation (Methods 1 and 3, Learning Outcome 1.1) • Installation (cost, timescales, ability to connect live to minimise effect on customers) • Operation (reliability, accuracy […]

SDRC 9.2(d) Evidence Report: Optimising Network Monitoring Based on Installation of First 100 Substation Monitors

Posted on September 9th, 2016

Criterion: Develop and Trial Method of Optimising Network Monitoring Based on Installation of First 100 Substation Monitors  Evidence: Prepare Report reviewing optimal deployment of monitors based on installation of first 100 substation monitors.     This document provides details of the review of the deployment of the first 100 substation monitors, and presents the findings […]

SDRC 9.2c Evidence Report: Install and Commission the Network Management Component of the Distributed Solutions Integrator System

Posted on September 9th, 2016

Criterion: Install and commission the Network Management component of the Distributed Solutions Integrator System (DSI) Evidence: Presentation of commissioning report to Ofgem. System tour and overview will be offered. Photographs can also be provided as a backup. The ‘Network Management component’ of the DSI is known as a Distribution Management System (DMS) and is referred to […]

SDRC 9.2(b) Evidence Report 100 Substation Monitoring Installations Installed

Posted on September 9th, 2016

This document provides details of the completion of the installation of the 100 substation monitors, and presents the findings identified in line with the evidence criteria specified for the Successful Delivery Reward Criteria (SDRC).   It is confirmed that:   100 substation locations have been identified from which data can be interpreted by the University […]

SDRC 9.2(a) Evidence Report: 250 End Point Monitors Installed

Posted on September 9th, 2016

  This document provides details of the completion of the installation of the 250 end point monitors, and presents the findings identified in line with the evidence criteria specified for the Successful Delivery Reward Criteria (SDRC).   It is confirmed that:   250 customers have been engaged and confirmed their acceptance for an end point […]