SDRC 9.8a 4 Cold Thermal LV Network Energy Storage

Posted on January 10th, 2017

This report meets the requirements of the New Thames Valley Vision (NTVV) Full Bid Submission [Ref. 01] and the associated change control documentation that was formally agreed by Ofgem [Ref. 02] for Successful Delivery Reward Criteria (SDRC) 9.8(a) Cold Thermal LV Network Energy Storage . Cold thermal storage technology has been installed at three commercial […]

SDRC 9.4(b) Evidence Report: Install 30 thermal energy storage devices

Posted on September 9th, 2016

SSEPD confirms that this criterion has been met through the installation of 30 energy storage devices (EMMAs) within domestic properties around Bracknell. This document provides details of the completion of the installation of 30 EMMAs, and presents the findings identified in line with the evidence criteria specified for the Successful Delivery Reward Criteria (SDRC). It is confirmed that: […]

SDRC 9.8a Part 4: LV Network Energy Storage

Posted on September 1st, 2016

The EMMA units deployed in NTVV have a control algorithm especially configured for this project to adjust the amount of PV energy exported on to the network by diverting excess amounts to a conventional hot water storage tank via the customers existing immersion heater. The units, adjusted for this project: use a learning model of […]